6.7L  Cummins Forum

6.7L Cummins Forum


Go Back   6.7L Cummins Forum > Cummins 6.7L OEM, Performance and Aftermarket Forums > Electrical
Home Forums Photo Gallery Arcade Members List Calendar
Register FAQ Search Today's Posts Mark Forums Read




Welcome to the 6.7L Cummins Forum forums.

You are currently viewing our boards as a guest which gives you limited access to view most discussions and access our other features. By joining our free community you will have access to post topics, communicate privately with other members (PM), respond to polls, upload content and access many other special features. Registration is fast, simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact contact us.
Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 12-29-2007, 07:52 PM
Squid's Avatar
Head Flunky
 

Join Date: Sep 2007
Location: South Central Kansas
Posts: 1,547

Default Cummins 6.7L Voltage Regulator

Electronic Voltage Regulator
DESCRIPTION

The Electronic Voltage Regulator (EVR) is not a separate component. It is actually a voltage regulating circuit located within the PCM (Powertrain Control Module) (within the ECM for diesel engines). The EVR is not serviced separately. If replacement is necessary, the PCM must be replaced.
OPERATION

The amount of direct current produced by the generator is controlled by EVR circuitry contained within the PCM. This circuitry is connected in series with the generators second rotor field terminal and its ground.
Voltage is regulated by cycling the ground path to control the strength of the rotor magnetic field. The EVR circuitry monitors system line voltage (B+) and battery temperature (refer to Battery Temperature Sensor for more information). It then determines a target charging voltage. If sensed battery voltage is 0.5 volts or lower than the target voltage, the PCM grounds the field winding until sensed battery voltage is 0.5 volts above target voltage. A circuit in the PCM cycles the ground side of the generator field up to 100 times per second (100Hz), but has the capability to ground the field control wire 100% of the time (full field) to achieve the target voltage. If the charging rate cannot be monitored (limp-in), a duty cycle of 25% is used by the PCM in order to have some generator output. Also refer to Charging System Operation for additional information.
__________________

2007.5 Dodge Ram 3500 HD,QC, 6.7L Cummins, 6speed Auto, 4X4, Bighorn Edition.
Click for installs: Carr Steps PML Diff Cover Edge Juice with Attitude Volant Intake Hankook ATM RF10
Reply With Quote
Links
Reply


Thread Tools
Display Modes



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -5. The time now is 11:48 AM.

SquidWorkz is Infiniti EX35_ FJ Cruiser_ Nissan Rogue_ Mahindra Trucks_ Toyota Venza_ Ducati Superbikes_ Nissan Titan_ Toyota Tundra
Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.2.0